Fire Access Road
Case Study Project Information: Creation of Fire Lane at Dell Customer Care Center
Dell, the world’s largest computer maker, announced plans in July 2004 to open a Customer Care Center in Oklahoma City. While initial plans for the project were for a 250-person customer care center, the scope of the project changed quite drastically when Dell officials decided instead to build a high profile campus with a workforce of over 1,000 persons.
A facility of this size would require dual fire access roads, and EZ Roll Grass Paver was selected for its durability and ease of installation - with cross-links connecting the flexible rows of nested cells, the product ships in 600 sq ft rolls and can be rolled out on the job site. On a job of this size, such a product feature was key, and saved significant time during installation.
EZ Roll Grass Pavers are also manufactured from 100% recycled material, making them a fitting choice for Dell.
Since the initial installation, Dell has committed to becoming the "greenest" technology company on the planet.
Today, Dell powers the Oklahoma City Campus with 100% wind energy, and the grass on the fire lane access roads is green and thriving.Fast Facts
Product
NDS EZ Roll Grass Paver 18,000 sq ft.
Location Address
2501 N Blackwelder Ave, Oklahoma City, TX.
Application
Emergency Access Lane.
Installation Date
July 2004.
More Information and Full Case Study PDFs to Download
- View our Case Studies Index Page for additional applications
- Download the full PDF case study: EZ Roll Grass Paver Installed to Create a Fire Lane at Dell Customer Care Center
- Have a technical question? Contact Technical Services
- Want to specify EZ Roll Grass Paver on your next project? Contact your Regional Specification Manager for technical design assistance, training seminars, and additional product information
- Looking for an EZ Roll Grass Paver distributor or pricing information? Contact Customer Service